New distribution center of GAP 'Resurs' has started its work in Rostov region

26.12.2024
348

The construction of this logistics facility, located in the Aksay district, was completed in October 2024 and became part of an investment project. The center occupies an area of ​​almost 14 thousand square meters and is equipped with modern engineering systems, information technology and high-tech refrigeration equipment. It has equipment for freezing and storing products at various temperatures, which allows distributing up to 1,200 tons of goods per day.

The opening of the fifth distribution center in the company’s network is aimed at optimizing logistics processes and improving interaction with clients both in Russia and abroad.

Tags:

Read together with it: